like cts suggested a a log chained parallel to and under the broken track and use another machine to drag it with the trans in neutral and tie the steering clutch lever in release position
it would ride like a skid. helpful if end of said log curved upwards so the but wasnt digging in the ground. notch the chains into the log help hold it in-place and you dont wear the chains away either. doesnt need to be very large diameter log just not break as you drag the machine to a better spot
fun bit is jacking the machine up to get log in place.
it was a way they moved big logs in days gone by was a decent forked branch placed under the butt of the log so it carried it. lash the fork to log attach pulling force to log
a family friend picked up a d8 years ago that had a busted final drive on one side they also had a scraper so was able to dig a hollow for the low loader to reverse into beside the machine and then cork screwed it around till it was on the deck gave it a nudge with the scraper push block to get it on the trailer properly pulled forwards and chained her on.
this was after the other truck driver spent a couple hrs trying to drive up the ramps and get part way up before she skidded off the ramps
he wouldnt listen to jeff in the first place finally got the shits and said "if your so smart then you do it".
from what you describe that trick would be possible here as no working room
"i reject your reality and substitute my own" - adam savage. i suspect my final words maybe "well shit, that didnt work"
instead of perfection some times we just have to accept practicality