I am doing some work on my 2u D8 and need rebuild measurements on the undercarriage 8 inch pitch.
thanks shaper.
Please log in or create an account to join the conversation.
Mon, Feb 28, 2011 6:53 AM
Old Magnet
Offline
Send a private message to Old Magnet
Posts: 16,696
Thank you received: 18
What specific work are you doing and what are the track link part numbers?
Please log in or create an account to join the conversation.
Mon, Feb 28, 2011 1:30 PM
shaper
Topic Author
Offline
Send a private message to shaper
Posts: 8
Thank you received: 0
Reply to Old Magnet:
What specific work are you doing and what are the track link part numbers?
Hi Magnet
I am going to weld build up what is needed on rails rollers and sprockets.The rail links are 1s8841 dry 8 inch pitch. the rollers are 8h5373 assem. I was going to use 7018 build up and wearshield mm or abr. I need new rail hight and roller diameter.
Thanks shaper.👍
Please log in or create an account to join the conversation.
Wed, Mar 2, 2011 6:55 AM
Tim Matthews
Offline
Send a private message to Tim Matthews
Posts: 147
Thank you received: 0
Reply to shaper:
Hi Magnet
I am going to weld build up what is needed on rails rollers and sprockets.The rail links are 1s8841 dry 8 inch pitch. the rollers are 8h5373 assem. I was going to use 7018 build up and wearshield mm or abr. I need new rail hight and roller diameter.
Thanks shaper.👍
Make sure your comfortable , 12 hours per roller , 3-4 days per rail . Tim
Please log in or create an account to join the conversation.
Wed, Mar 2, 2011 9:04 AM
Old Magnet
Offline
Send a private message to Old Magnet
Posts: 16,696
Thank you received: 18
Reply to Tim Matthews:
Make sure your comfortable , 12 hours per roller , 3-4 days per rail . Tim
Rail height new (highest they had) is 4.97 in.
Attached are roller rebuild specs and sprocket profile....both courtesy of edb.
You must be figuiring on having a lot of time on your hands.....
Please log in or create an account to join the conversation.
Wed, Mar 2, 2011 10:19 AM
tanker
Offline
Send a private message to tanker
Posts: 134
Thank you received: 0
Reply to shaper:
Hi Magnet
I am going to weld build up what is needed on rails rollers and sprockets.The rail links are 1s8841 dry 8 inch pitch. the rollers are 8h5373 assem. I was going to use 7018 build up and wearshield mm or abr. I need new rail hight and roller diameter.
Thanks shaper.👍
[quote="shaper"]Hi Magnet
I am going to weld build up what is needed I was going to use 7018 build up
Thanks shaper.👍[/quote]

7018= kinda slow- I used lincoln la90 wire w/ co2- bout 2hr/ roller - overbuilt - then to lathe-to make like new- no hard sf- [wire work hardens on sfc] seems to work quite well
Please log in or create an account to join the conversation.
Wed, Mar 2, 2011 10:55 AM
Showing 1 to 5 of 5 results
YouTube Video Placeholder

Follow Us on Social Media

Our channel highlights machines from the earliest Holt and Best track-type tractors, equipment from the start of Caterpillar in 1925, up to units built in the mid-1960s.

Upcoming Events

High Weald Steam Working Weekend

Chapter Two

| Freshfield Farm, Sloop Lane, Scaynes Hill RH17 7NP UK

Sibbertoft Annual Muck Shifting Weekend

Chapter Two

| Avalanche adventure, Welford Rd, Sibbertoft LE16 9UJ, UK

Cromford Steam Rally

Chapter Two

| Highacres Farm, Dewey Lane, Brackenfield, Derbyshire DE55 6DB, UK

The Century of Caterpillar

| Elkader, 203 Johnson St, Elkader, IA 52043, USA
View Calendar
ACMOC

Antique Caterpillar
Machinery Owners Club

1115 Madison St NE # 1117
Salem, OR 97301